Additional information
Lead Time | 8-10 weeks |
---|---|
Brand | Antonangeli |
Installation Orientation | Ceiling Mount |
From an attachment on the ceiling with transformer included, can be connected 4/6/8 small LED suspensions as “candles”.
The project involves the placement of the power supply to the ceiling and offers the freedom to let “drop” the single suspensions to the desired point.
POA
From an attachment on the ceiling with transformer included, can be connected 4/6/8 small LED suspensions as “candles”.
Lead Time | 8-10 weeks |
---|---|
Brand | Antonangeli |
Installation Orientation | Ceiling Mount |